Soundview combines blocks of attached row houses with driveways, large apartment complexes, and commercial frontages along Westchester Avenue and Soundview Avenue. In the 2020 Census it was the most populous neighborhood area in the Bronx. Easyfix Concrete NY repairs sidewalks, driveway aprons and concrete for homeowners and property managers here.
On row house blocks the sidewalk, the driveway apron and the curb cut often need attention together. We look at the whole frontage, pour aprons at the 7 inch DOT standard and handle the permits.
Concrete, Sidewalk & Compliance Services in Soundview
Sidewalk Repair in Soundview
Cracked and uneven flags in front of row houses and apartment buildings replaced to the DOT standard.
Concrete Repair in Soundview
Front stoops, rear yards and walkways repaired and pitched so water drains away from the house.
DOT Violation Removal in Soundview
Homeowners with a DOT notice get the flagged defects replaced, the permit filed and the dismissal inspection requested.
ADA Compliance in Soundview
Corner homes and buildings are responsible for their quadrant and ramps. We rebuild ramps with the correct slopes and warning surfaces.
Working in Soundview
- About 7 in 10 lots are 1 to 3 family homes, so owners with City tree damage should check the Trees and Sidewalks program first.
- Driveway aprons are poured at the 7 inch DOT standard.
- Blocks near the Bronx River and the shoreline get extra attention to drainage.
ZIP Codes and Streets We Cover in Soundview
- 10472
- 10473
Including homes, apartment buildings and storefronts along Westchester Avenue, Soundview Avenue and Bruckner Boulevard.
Soundview FAQs
Can you replace my driveway apron and sidewalk together?
Yes. The apron and sidewalk can be done in one job. Aprons are poured at 7 inches, the DOT standard for driveways.
A tree lifted my sidewalk. Do I have to pay?
If you own a 1 to 3 family home and a City tree caused the damage, the City no longer issues violations for that damage, so check the Trees and Sidewalks program before hiring anyone.
How long does a row house sidewalk take?
Most single frontages are removed and poured in a day or two, and foot traffic can return in 24 to 48 hours.
Sources & Standards
The rules and specifications on this page are based on these official sources. Requirements change, so we confirm what applies to your property during the free estimate.
- Sidewalks: violations, repairs and inspections NYC Department of Transportation
- NYC Sidewalks: A Property Owner’s Guide to Address Sidewalk Defects NYC Department of Transportation (PDF)
- Trees and Sidewalks Repair NYC311
- 2020 Census: Neighborhood Tabulation Areas and Community Districts NYC Department of City Planning (Excel)